Infrastructure
Our experts are making sure that each project is completed on time.
Among the projects analyzed by our team members are:
- Expansion and rehabilitation of water supply and sewerage networks in Șimleu Silvaniei, Sălaj County;
- Expansion and rehabilitation of water supply and sewerage networks in Cehu Silvaniei, Sălaj County;
- Creating the green wave for tram on Dacia Brigde – Magheru Boulevard, Oradea;
- Arrangement of intersection by uneven passage between the ring road of Oradea City and University Street;
- Passage level on the bypass belt Arad (DN7 km 540 + 248) over CF Arad – Bucharest;
- Demolition of Plevnei footbridge (pedestrian and for cyclists) of reinforced concrete over Crișul Repede and construction of a bridge over Crișul Repede river between Plevnei Street and Szigligeti Ede Street;
- Completion of works at Gilău Node and the connection between Section 2B and Subsection 3A1, Brasov – Târgu Mureș – Cluj – Oradea Highway;
- Construction of the overpass over the ring road of Oradea City in the area of Nojoridului Street;
- Construction of an overpass over the ring road of Oradea City in the area of Ciheiului Street;
- Reabilitation DN 1H Zalău – Aleșd Lot 1: km 0+000 – km 26+510;
- Technical assistance for the preparation of the financing application and the award documentation for the regional project for the development of the water and waste water infrastructure in the counties of Prahova, Bistrița, Argeș, between 2014-2020;
- Design services for PAC, PTE, AT phases and execution of works for the objective “Passage over the railway on DN61 km 77+200 in Găesti”;
- Water networks Pecineaga, Amzacea, Headrace 23 August – Dulcesti – Pecineaga. Sewerage networks Pecineaga, 23 August;
- Rehabilitation and extension of the distribution and sewerage networks, new water pumping station and related pipelines from Techirghiol locality and rehabilitation and extension of the distribution network from Biruinta locality, Constanta County;
- Construction of a bridge over Somesul Mic river that connects Oasului Street and Răsăritului Street in Cluj – Napoca City;
- Design and execution services for ”Pețea site access road” RoHu53;
- Technical assistance for the Project management and supervision of works within the Project ” Development of water and wastewater infrastructure in Onești City during 2014-2020”;
- Execution of works related to the investment objective “Green line of public transport using means of transport with electric or hybrid engine or low pollution norm”;
- Design (PAC+PT+CS+DDE+project technical verification+Technical assistance from the designer) and execution “Bridge over Lonea Valley in Dabica commune, Cluj County”;
- Execution of works for the objective: Rehabilitation of DN66 by redevelopment of the sector between km 105+000- km 105+580 in order to build a new bridge over Jiu de la Meri la km 105+250 and redevelopment of the sector between km 106+220 – km 106+965 in the monastery area;
- Pedestrian walkway and velo over Someș river in Satu Mare City;
- Rehabilitation of Bistrita Lechinta supply pipeline and extension of water supply and sewerage in the communes of Lechinta, Micestii de Campie, Sanmihaiu de Campie and Budesti 1 – Lot 1: Rehabilitation of Bistrita Lechinta supply pipeline 2 – Lot 2: Extension of water supply and sewerage in the communes of Lechinta, Mircestii de campie, Sanmihaiu de Campie and Budesti;
- Execution of works for the investment objective: “Sustainable urban mobility corridor in Emanuil Gojdu Square in Oradea – Stage II”;
- Water networks Cernavodă, Faclia and Tortoman. Headrace Faclia, Cernavoda. Sewerage networks Cernavodă, Satu Nou and Mircea Vodă;